Electrical

Grid & Connection Advisory

Residual grid capacity, favorable TICA, technical connection alternatives.

When you need it

  • You are a developer with a specific project looking for connection capacity.
  • You are an industrial buyer evaluating the installation of a large PV plant.
  • You are an asset owner planning an expansion.
  • You need to evaluate technical alternatives before TICA.

What we do

Residual capacity analysis, TICA rules, technical connection alternatives. Recommended strategy to obtain favorable TICA.

Typical deliverables

  • Residual grid capacity analysis
  • Verification of applicable TICA rules
  • Technical connection alternatives
  • Recommended strategy

Engagement model

Pulse and Mandate

Two levels of depth for the same service. Choose based on the decision you have to make.

Do you have a project to evaluate?

We start with a conversation. A partner replies to you directly.